DAM PICTURES TAKEN IN 2004
Front
face of dam.
View of rip-rap
Insufficient
rip-rap.
Adequate rip rap.
Primary
outlet.
Drop outlet tube, metal grid
and fish net.
Emergency
(concrete) spillway.
Base of spillway in need of
repair.
Ogee
lip, note spalling.
Patching.
Energy
dissipator.
Concrete chute.
Stream
bed.
Burn pile.
Back
of dam.
Top and front.
And when it rains, a gulleywash.